Quality Concrete Holdings Berhad

Company No. 378282-D

and Group of its Companies

Ongoing and Completed Projects

Completed Projects (Property Development)

  • Summerville Villa, Bintulu, Completed 2004 (RM22.6 Million)
  • 56 units 3-storey shop houses at Lot 618, Blk 233, Kuching North Land District (6 ½ Miles Penrissen Road, Kuching)
  • 70 units Semi-Detached & 4 units Detached of Modern Light Industrial Estate at Lot 307, 308, 309, 310 & 311 Block 24 Muara Tuang Land District – Phase 1 (Estimated RM 27.62 Million)

Completed Projects (Water Works)

  • Tanjung Manis Water Supply Phase 1 - Proposed Distribution Pipelines at Tanjung Manis Package 8 (RM 61 Million)
  • Projek Bekalan Air Luar Bandar (BALB) Secara Konsep Bersepadu Bagi Negeri Sarawak Tahun 2008/2009 Zone 6, Completed 2010 (RM9.8 Million)
  • Projek Bekalan Air Luar Bandar Sistem Retikulasi Tahun 2010 Negeri Sarawak (Zon 3) Untuk Bintulu, Mukah dan Miri (RM26.4 Million)
  • Projek Bekalan Air Luar Bandar Sistem Retikulasi Tahun 2010 Negeri Sarawak (Zon 4) Untuk Daerah Limbang dan Lawas (RM11.1 Million)
  • Projek Bekalan Air Luar Bandar Sistem Retikulasi Tahun 2010 Negeri Sarawak Zon 4 (Fasa 3) - Kampung Ulu Penganan (RM4.66 Million)
  • Projek Bekalan Air Luar Bandar Sistem Retikulasi Tahun 2010 Negeri Sarawak (Zon 2) (RM28 Million)
  • Projek Membina Dan Menyiapkan Bekalan Air Luar Bandar Untuk Watermains Extension to Long House and Nearby Settlement Along Jalan Sebato, Batu Niah, Miri Division, Sarawak (RM8.13 Million)
  • Projek Bekalan Air Luar Bandar Sistem Retikulasi Tahun 2010 Negeri Sarawak Zone 3 (Fasa 3) (RM11.3 Million)
  • Project Membina Dan Menyiapkan Bekalan Air Luar Bandar Ke Rh Stephen Kedu Ak Jugam Dan Lain-Lain Di Sepanjang Jalan Ulu Niah, Niah, Bahagian Miri, Sarawak (RM18.4 Million)
  • Arahan Kerja (Work Order) Bagi Pelaksanaan Cadangan Bekalan Air Ke Kpg. Bruit Dan Kpg. Tekajong, Bahagian Mukah, Sarawak (RM54.5 Million)
  • Projek Membina Dan Menyiapkan Bekalan Air Luar Bandar Kawasan Sebauh, Bahagian Bintulu, Sarawak (RM69.4 Million)
  • Projek Bekalan Air Luar Bandar Wilayah Matu/Daro, Bahagian Mukah, Sarawak (RM79 Million)
  • Proposed Pipeline Extension Batu Danau To Ng Medamit Phase 1 (Rh Empili, Lubuk Tuan, Rh Ili, Mengari, Rh Bety, Rh Dindang, Sg, Limbang, Rh Luta & Kpg. Tanjung Riman), Limbang Division, Sarawak (RM10.5 Million)
  • Projek Membina Dan Menyiapkan Bekalan Air Luar Bandar Untuk Kawasan Tatau (Fasa II), Bahagian Bintulu, Sarawak (RM10.5 Million)
  • Projek Membina Dan Menyiapkan Bekalan Air Luar Bandar Negeri Sarawak Ke Kuala Balingian Dan Sungai Serupai, Sarawak (RM12.1 Million)
  • Projek Membina Dan Menyiapkan Bekalan Air Luar Bandar Untuk Watermains Extension To Kampungs Along Long Tuma Road, Off Merapok Toad, Lawas, Limbang Division, Sarawak (RM8.93 Million)
  • Projek Membina Dan Menyiapkan Bekalan Air Luar Bandar Jalan Miri-Bintulu ke Simpang Batu Niah Dan Sepupok, Bahagian Miri, Sarawak (RM15.95 Million)
  • Projek Membina Dan Menyiapkan Bekalan Air Luar Bandar Kampung Punang, Lawas, Sarawak (RM10.89 Million)
  • Projek Membina Dan Menyiapkan Bekalan Air Luar Bandar Dari Bt. 18 1/2 ke Bt. 40, Jalan Bintulu-Miri, Bintulu, Negeri Sarawak RM25.6 Million)
  • Projek Membina Dan Menyiapkan Bekalan Air Luar Bandar ke Rh Unjine, Rh Robin, Rh Mudan, Rh James Brooke, Rh Chabi, Rh Banyang Dan Lain-Lain, Tatau, Bintulu, Sarawak (RM14.2 Million)

Ongoing Current Projects (Property Development)

  • 70 units Semi-Detached & 4 units Detached of Modern Light Industrial Estate at Lot 307, 308, 309, 310 & 311 Block 24 Muara Tuang Land District – Phase 2 (Estimated RM 24.753 Million)

Ongoing Current Projects (Water Works)

  • None

 Upcoming and Future Projects

Coming Projects

  • Housing Projects at Lot 3 (229), Block 6, Matang Land District (Estimated RM 9.8 Million)
  • Housing Projects at Lot 3 (1374 & 1381), Block 6, Matang Land District

Future Projects

  • Approximately 5 acres of land at Country Lease No. 215130073, Jesselton, Penampang Land District, Sabah
  • Approximately 118.05 acres of land at Lots 185 and Lot 494, Block 36, Muara Tuang Land District

Our Project Team

Paul Chiam Tau Keen (Director)

Ir. Lau Kiing Chuong (General Manager)

Tang Dai Faut (Project Manager)

Mr. Lei Ko Hoo (Contract Manager cum Senior Quantity Surveyor)

 

Aggregates and Stones
Aggregates and Stones
Property Development
Property Development
Sawn Timber and Timber Related Products
Sawn Timber and Timber Related Products
Ready-Mixed Concrete
Ready-Mixed Concrete
Precast Concrete Square Piles
Precast Concrete Square Piles
Construction in Building, Civil, Water and Other Works
Construction in Building, Civil, Water and Other Works
HDPE pipes
HDPE pipes